HEX-Improvement CGS 4 and 5 6 May 2015 admin Past Project, Portofolio 0 EPC Project to improve Heat Exchanger at CGS 4&5 HOOU-CPI including pipe line, jacketing, Safety in Design etc. RelatedPC Fire Water System Improvement ProjectE,P,C Pungut Well Test, Gathering Station And Water Injection PlanEPC Transmition and Distribution Line HODesign, Fabrication and Installation of FRP Tank and PipesProgram Peningkatan Pendidikan untuk Masyarakat Minas (Bag-2)