
PIT AND CANAL MAINTENANCE SERVICES AT SLN
Start on 12 December 2011. Cleaning for Canal at 33 Location and Pit at 29 Location. All Location is at South Light North CPI. This …
Start on 12 December 2011. Cleaning for Canal at 33 Location and Pit at 29 Location. All Location is at South Light North CPI. This …
Start on 23 December 2011, Phase 2 of Sand Management Construction CPI at Area 6 HO, including installation of Pumps, Piping, Electrical, Instrumentation, Road and …
Start On 5 December 2011. Build Facilities to upgrade Rantau Bais GS including installation of Equipment such as : VRU, Gas Boot, Heater Treater, Fuel …
PT. Wahanakarsa Swandiri shall provide Chevron with Facilities, which includes one unit of Clarifier Tank 17730 bbls and one unit of Water surge tank 15366 …
PT Wahanakarsa Swandiri construct Duri Centralized Cleaning Facility (DCCF).This facility is designated for the cleaning facilityof tailgate truck, square tank, drilling & well service rig …
Scope of work PT. Wahanakarsa Swandiri shall perform services as pipeline of main water circulation, pipeline of water from WP-II to WP VI, piping for …