PIT AND CANAL MAINTENANCE SERVICES AT SLN

Start on 12 December 2011. Cleaning for Canal at 33 Location and Pit at 29 Location. All Location is at South Light North CPI. This project utilize major equipment such as : amphibious excavator, Long arm Hydraulic excavator, Dump Truck, Standar excavator, Crane, Triller.