No | Name of Project | Nature of Work | Location | Type Of Contract ( E/P/C/EPC) | Contract Period Start/Completion ( Scheduled ) | Owner Company Name |
---|---|---|---|---|---|---|
YEAR | : 2017 to present | |||||
1 | Sumatera Light Oil (SLO) Tank Cleaning and Repair | Procurement & Construction | Riau | Procurement & Construction | 20 March 2017 to 19 March 2022 | PT. CPI |
2 | Constrcution Services - Work Unit Rate (CS WUR) Package A Bridging | Maintenance | Riau | Maintenance | 13 January 2017 to 12 July 2017 | PT. CPI |
3 | Constrcution Services - Resources Unit Rate (CS RUR) Package C | Maintenance | Riau | Maintenance | 9 Januari 2017 to 31 March 2022 | PT. CPI |
4 | "Duri CPS Tank Fire System Improvement Services " | Engineering, Procurement & Construction | Riau | Engineering, Procurement & Construction | 2 Februari 2017 to 30 Juli 2018 | PT. CPI |
YEAR | : 2016 | |||||
1 | Muara Laboh Geothermal Power Project Stage 1 Development – Provision of Civil and Infrastructure Works | Engineering, Procurement & Construction | Muara Laboh, Solok Selatan - Sumatra Barat | Engineering, Procurement & Construction | 20 October 2016 to 20 January 2018 | PT. Supreme Energy Maura Laboh |
3 | Petapahan Gathering Satation Upgrade Project | Procurement & Construction | Riau | Procurement & Construction | 18 July 2016 to 17 July 2017 | PT. CPI |
4 | EPC Cathodic Protection of Petapahan-Kotabatak Pipeline Project | Engineering, Procurement & Construction | Petapahan-Kotabatak | Engineering, Procurement & Construction | 25 April 2016 to 24 April 2018 | PT. CPI |
5 | EPC Petapahan WFU Storage Tanks | Engineering, Procurement & Construction | Petapahan | Engineering, Procurement & Construction | 15 February 2016 to 14 February 2017 | PT. CPI |
YEAR | : 2015 | |||||
1 | Procurement & Construction for Off Plot Petapahan Waterflood Project and Construction Services in Coverage Area | Procurement & Construction | Petapahan, Kotabatak, Rantau Bais and Petani | Procurement & Construction | 04 January 2016 to 03 January 2018 | PT. CPI |
2 | Pekerjaan Pipe System Indarung VI | Procurement & Construction | Padang | Procurement & Construction | 21 Desember 2015 to 01 Agustus 2016 | PT. Semen Padang |
3 | Jasa-jasa Pengadaan Alat Berat dengan Operator untuk mendukung operasi di EFO-EFPM Sumatra | Rental Equipment | SMO | Maintenance | 18 Desember 2015 to 17 Desember 2016 | PT. CPI |
4 | Jasa-jasa Penyewaan dan Peralatan AC di Duri | Procurement & Maintenance | Duri | Procurement & Maintenance | 01 Desember 2015 to 31 Januari 2017 | PT. CPI |
5 | Preventive and Minor Repair of Housing, Offices, Public and Recration Building Include Infrastructure at Duri East & Libo Area | Maintenance | Duri & Libo | Maintenance | 01 Desember 2015 to 30 November 2017 | PT. CPI |
6 | Construction Services - Work Unit Rate - Well Program Surface Facilities - Package A | Construction Services | HOOU | Maintenance | 04 Agustus 2015 to 2 February 2016 | PT. TJE |
7 | Construction of Duri Centralized Cleaning Facility | Procurement & Construction | HOOU | Construction | 28 Agustus 2017 to 27 Agustus ... | PT. CPI |
8 | Construction Services - Work Unit Rate - Well Program Surface Facilities - Package B | Construction Services | HOOU | Maintenance | 01 Juli 2015 to 30 Juni 2016 | PT. CPI |
9 | Amendment 1 SLO CMTF Pit Construction Package C Balam | Procurement & Construction | SLN Area | Construction | 17 Maret 2015 to 31 Desember 2015 | PT. CPI |
10 | Electrical Power Pole Integrity | Maintenance | All Area CPI | Maintenance | 15 Mei 2015 to 14 Mei 2018 | PT. CPI |
11 | SLO South Tank Repair Project | Engineering, Procurement & Construction | SLS Area | Engineering, Procurement & Construction | 5 January 2015 to 4 january 2017 | PT. CPI |
12 | Construction Services Resources Unit Rate (CS RUR B) | Construction Services | SLS Area | Maintenance | 21 January 2015 to 20 July 2015 | PT. CPI |
YEAR | : 2014 | |||||
1 | EPC Oil Wharf #1 Damage Rapair | Procurement & Construction | Dumai | Engineering, Procurement & Construction | 08 Desember 2014 to 07 April 2016 | PT. CPI |
2 | Procurement & Construction Services for KO Drum Repalcement at Minas GS-2 and Kotabatak GS | Procurement & Construction | SLS Area | Engineering, Procurement & Construction | O9 October 2014 to 08 Mei 2016 | PT. CPI |
3 | SLO CMTF Pit Construction Package A Kotabatak | Procurement & Construction | SLN Area | Construction | 22 September 2014 to 21 March 2015 | PT. TJE |
4 | SLO CMTF Pit Construction Package C Balam | Procurement & Construction | SLN Area | Construction | 29 Agustus 2014 to 28 Februari 2015 | PT. CPI |
5 | Construction Services Resources Unit Rate (CS RUR B) | Construction Services | SLS Area | Maintenance | 21 Juli 2014 to 20 Januari 2015 | PT. CPI |
YEAR | : 2013 | |||||
1 | EPC for Transmission and Distribution Line of Duri Darling Substation Project | Engineering, Procurement and Construction | HOOU | Construction | 14 Januari 2013 to 13 Juli 2014 | PT. CPI |
2 | Resources Unit Rate (RUR) B Contract Amend 1 | Construction Services | SLN & HO Operation | Maintenance | 01 Januari 2013 to 30 Maret 2013 | PT. CPI |
YEAR | : 2012 | |||||
1 | Resources Unit Rate (RUR) B Contract | Construction Services | SLS Operation | Maintenace Services | 26 September 2012 to 31 Desemeber 2012 | PT. CPI |
2 | Construction Services Work Unit Rate Paket C | Construction Services | All Area | Maintenance | 23 Juli 2012 to 14 Maret 2014 | PT. CPI |
3 | Rig Assist Contract Services | Contract Service for Rig Assist | All Area | Drilling | 24 Mei 2012 to 23 Feb 2013 | PT. CPI |
4 | Fin Fan Cooler Relocation for Minas Surfactant Project | Construction | Minas | Construction | 05 April 2012 to 27 Juli 2012 | PT. CPI |
5 | Resources Unit Rate (RUR) A Contract | Construction Services | SLN & HO Operation | Maintenance | 01 April 2012 to 30 Sept 2012 | PT. CPI |
YEAR | : 2011 | |||||
1 | PIT And Canal Maintenance Services for Sumatra Light North (SLN) | Maintenance | SLN Operation | Maintenace Services | 12 Des ‘11 to 11 Des ‘14 | PT. CPI |
2 | Procurement and Construction for Rantau Bais GS Upgrade Project | Procurement & Construction | Rantau Bais | Engineering Procurement Construction | 5 Des ‘11 to 4 Apr ‘13 | PT. CPI |
3 | Procurement and Construction Electrical, Piping and Building Works of SMF-2 HOOU | Procurement & Construction | HOOU | Engineering Procurement Construction | 23 Des ‘11 to 22 Okt’12 | PT. CPI |
4 | Design, Fabrication, and Construction of FRP Tank and Pipes | Fabrication, Procurement & Construction | Minas | Engineering Procurement Construction | 03 Ags ‘11 to 25 Okt’12 | PT. CPI |
5 | Procurement & Construction for Civil Work of SMF-2 HOOU | Procurement & Construction | HOOU | Procurement & Construction | 18 Ags ‘11 to 17 Jun ‘12 | PT. CPI |
6 | Procurement & Construction Services for Bekasap Water Management Project | Procurement & Construction | Bekasap, Pematang, Petani | Procurement & Construction | 27 Jun ‘11 to 26 Jul ‘12 | PT. CPI |
7 | Procurement & Construction Fire Water System Improvement Project | Procurement & Construction | HO OU | Engineering Procurement Construction | 02 Mei ’11 to 01 Nov ’12 | PT. CPI |
8 | Procurement & Construction Concrete PIT at Minas GS | Procurement & Construction | Minas | Engineering Procurement Construction | 21 Jan ‘11 to 24 Jan ‘12 | PT. CPI |
9 | Jasa-jasa pendukung kegiatan pengeboran (Rig Assist) | Construction Services | all Area | Drilling | 1 Mei ‘11 to 30 Apr ‘12 | PT. CPI |
YEAR | : 2010 | |||||
1 | Oil Well Workover Fluid Handling Facilities - SLO | Procurement & Construction | SLS and SLN | Engineering Procurement Construction | 25 Jan ‘11 to 24 Ags ‘12 | PT. CPI |
2 | Rig Assist Services 6 month | Construction Services | All Area | Drilling | 1 Nov ‘10 to 30 Apr ‘11 | PT. CPI |
3 | Construction Services NDC Warehouse Project | Procurement & Construction | Duri | Engineering Procurement Construction | 11 Oct ‘10 to 10 Mar ‘10 | PT. MCTN |
4 | Rig Assist Services Contract | Construction Services | All Area | Drilling | 1 Ags ‘10 to 30 Oct ‘10 | PT. CPI |
5 | Pengadaan dan pembangunan fasilitas PIT di GS Minas | Procurement & Construction | Minas | Engineering Procurement Construction | 16 Jun ‘10 to 15 Feb ‘11 | PT. CPI |
5.a | Amendement 1 | 03 Jan ‘11 to 18 Sep ‘11 | PT. CPI | |||
6 | Pembangunan fasilitas management limbah industri di Minas | Procurement & Construction | Minas | Engineering Procurement Construction | 16 Jun ’10 to 15 Jun ’11 | PT. CPI |
7 | Rig Assist Services Contract | Construction Services | All Area | Drilling | 1 Jun ‘10 to 30 Jul ‘10 | PT. CPI |
8 | HCT Equipment Maintenance Facilities Services | Construction Services | Dumai | Maintenance | 17 Mei ‘10 to 16 Jul ‘13 | PT. CPI |
9 | Desain, Fabrikasi & ErectionTanks & Vessel | Fabrication, Procurement & Construction | Minas | Engineering Procurement Construction | 15 Apr ‘10 to 14 Oct ‘11 | PT. CPI |
10 | Kotabatak PSU & WFE | Procurement & Construction | Kotabatak | Engineering Procurement Construction & Installation | 5 Mar ‘10 to 4 Mar ‘11 | PT. CPI |
11 | Rig Assist Services Contract | Construction Services | All Area | Drilling | 1 Mar 10 to 30 Mei ’10 | PT. CPI |
YEAR | : 2009 | |||||
1 | Rig Assist Services Contract | Construction Services | All Area | Drilling | 1 Dec ‘09 to 28 Feb ‘10 | PT. CPI |
2 | EPC Gpon Multi Plexer | IT System and Commissioning | Duri | Engineering Procurement Construction & Installation | 28 Aug ‘09 to 28 Dec ‘09 | PT. CPI |
3 | Rig Assist Services Contract | Construction Services | All Area | Drilling | 1 Sep’09 to 30 Nov ‘09 | PT. CPI |
4 | Provision Tanks API-650 in Kotabatak GS | Fabrication & Construction | Kotabatak | Fabrication Procurement Construction | 14 Aug ‘09 to 13 Aug ‘10 | PT. CPI |
4.a | Amendement 1 | 14 Aug ‘09 to 13 Oct ‘10 | PT. CPI | |||
5 | Rig Assist Services Contract | Construction Services | All Area | Drilling | 1 Jun ‘09 to 30 Aug ‘09 | PT. CPI |
6 | Resource Unit Rate Paket A | Construction Services | SLN Operation | Maintenance | 26 Mei ’09 to 25 Mei ’13 | PT. CPI |
YEAR | : 2008 | |||||
1 | Pipeline Modification for Pig Launcher & Pig Receiver | Fabrication Construction | Duri | Engineering , Procurement , Construction | 19 Nov ‘08 to 24 Oct ‘09 | PT. CPI |
2 | EPC-Stasiu n Pengumpul Dan Distribusi Air Pungut | Fabrication Procurement Construction | Duri | Engineering , Procurement , Construction, Fabrication | 9 Jul ‘08 to 31 Oct ‘09 | PT. CPI |
3 | Multidisciplin Works CGS-4 & CGS-5 | Construction | Duri | Engineering , Procurement , Construction | 3 Jul ‘08 to 30 Jun ‘09 | PT. CPI |
4 | Waste Management | Construction | Duri | Engineering , Procurement , Construction | 2 Jun ‘08 to 14 Aug ‘09 | PT. CPI |
5 | Rig Assy Services Contract, Ammend-1 | Construction Services | All Area | Drilling | 27 Dec ‘07 to 26 Mar ‘08 | PT. CPI (PT. REKIN) |
6 | Resource Unit Rate Paket B | Construction Services | Minas (SLS) CPI Area Riau | Maintenance | 1 Mei ‘08 to 30 April ‘08 | PT. CPI |
7 | EPC-Stasiu n Pengumpul Dan Distribusi Air Pungut | Civil, Mechanical, Piping, Electrical, Instrument, Pre Commissioning Work | Pungut CPI Area | Engineering , Procurement , Construction & commissioning | 20 Feb 08 to 19 Nov 08 | PT. CPI |
8 | Piping Fiber Glass CGS 10 DSF Duri | Civil, Piping | Duri DSF CPI Area | Engineering, Consrtuction | 29 Nov ‘07 to 20 Mar ‘08 | PT. CPI |
9 | GPON Multiplexer | IT System and Commissioning | Duri, Pungut, Sintong & Balam CPI Area | Engineering, Procurement, Construction and Installation | 19 Feb 08 to 19 May 08 | PT.CPI |
YEAR | : 2007 | |||||
1 | Civil Works For Concrete Pavement SPL Yard at Petapahan at SLS Area | Civil Fondation Work | Petapahan CPI Area Riau | Procurment & Construction | 6 Sep ‘07 to 10 Oct ‘07 | PT. CPI |
2 | Civil Works For Service | Earthworks Site preparation, Foundation, Pipe Support, Platform Work | Pager GS CPI Area Riau | Procurment & Construction | 27 June 2007 | PT. CPI |
3 | Civil Works For Construct Of Stair Way | Fabricate & Installation stair way Civil Work | Minas (SLS) CPI Area Riau | Procurment & Construction | April 07 to May 07 | PT. CPI |
4 | Procurement Construction Pipe | Procurment & Construction | RAPP Kerinci | Procurment & Construction | ||
4.A | Addidional | |||||
5 | Contract No, C-194-002-IKL-WKS-07 Contract of Heating, Ventilation and Air Conditioning System | Civil, Electrical | BP West Java Ltd | Engineer, Procurment & Construction | 17 Marc 2007 | |
YEAR | : 2006 | |||||
1 | Civil Works For Concrete Pavement SPL Yard at Petapahan at SLS Area | Civil Fondation Work | Petapahan CPI Area Riau | Procurment & Construction | 6 Sep 07 to 10 Oct 07 | PT. CPI |
2 | Pig Laucher & Receiver Fabri & Cert | Enggineering, Procurment,Fabricate, Install (Mechanical & Piping Work) | Dumai, Bangko, Duri - CPI Riau | Enggineering, Procurment, Construction | 10 Jan ‘07 to 10 Aug ‘07 | PT. CPI |
3 | Bangko Injection Pump Spare Project | Civil, Mechanical, Piping, Electrical, Instrument, Pre Commissioning Work | Bangko CPI Riau | Procurment & Construction | 11 Dec ‘06 to 11 Apr ‘07 | PT. CPI |
4 | Barton Chart Recorders at Minas | Piping, Instrument Work | Minas (SLS) CPI Area Riau | Construction | Des 06 to Mar 07 | PT. CPI |
5 | Libo Area Pipe Replacement | Piping, Civil Work | Libo CPI Area Riau | Construction | 27 Nov ‘06 to 11 Jan ‘07 | PT. CPI |
6 | Bekasap Flowline Replacement | Piping, Civil Work | Bekasap CPI Area Riau | Construction | 27 Nov ‘06 to 5 Apr ‘07 | PT. CPI |
7 | Pipe Replacement Jurong Line # 13 To Intersection Jurong GS | Piping, Civil Work | Jurong CPI Area Riau | Construction | 27 Nov ‘06 to 15 Jun’07 | PT. CPI |
8 | Pipe Replacement Jurong Line # 8 To Intersection Jurong Intersection | Piping, Civil Work | Jurong CPI Area Riau | Construction | 15 Nov’06 to 15 Jun’07 | PT. CPI |
9 | North Menggala Pipe Replacement | Piping, Civil Work | Menggala CPI Area Riau | Construction | 30 Nov ‘06 to 31 Jan ‘07 | PT. CPI |
10 | Bangko Northern Area Pipe Replacement 2006 | Piping, Civil Work | Bangko CPI Area Riau | Construction | 29 Nov 06 to 30 Jan 07 | PT. CPI |
11 | Construction Of GS-3 Flare Improvement Project | Mechanical, Piping, Civil, Commissioning Work | Minas GS 3 (SLS) CPI Area Riau | Enggineering, Procurment, Construction | Sept 06 to Aug 07 | PT. CPI |
12 | Fencing Installation At PIT & Cooling Pond South Menggala GS | Civil Work | Manggala CPI Area Riau | Procurment & Construction | 16 Sep 06 to 20 Dec 06 | PT. CPI |
13 | Fencing Installation At PIT & Cooling Pond Puncak GS | Civil Work | Puncak CPI Area Riau | Procurment & Construction | 16 Sep 06 to 8 Dec 06 | PT. CPI |
14 | Batang West Production Line Replacement 2006 At SLN Area | Piping, Civil Work | Batang CPI Area Riau | Construction | 7 Sep 06 to 23 Nov 06 | PT. CPI |
15 | Fencing Installation At 75 Pumping Unit Wells At Balam Field | Civil Work | Balam CPI Area Riau | Procurment & Construction | 30 Aug 06 to 25 Jan 07 | PT. CPI |
16 | Fencing Installation At Cooling Pond Ubi/Sikladi GS | Civil Work | Ubi Sikaladi CPI Area Riau | Procurment & Construction | 30 Augs‘06 to 22Nov ‘06 | PT. CPI |
17 | Fencing Installation At Cooling Pond Pager GS | Civil Work | Pager GS CPI Area Riau | Procurment & Construction | 30 Aug 06 to 22 Nov 06 | PT. CPI |
18 | Optical Transmission : SDH Type RSTM-E1 | IT System, Commissioning Work | ALL CPI Area Riau | Enggineering, Procurment, Construction | 24 August 2006 | |
19 | Pipe Replacement didaerah Bangko Central & Seruni Field | Piping, Civil Work | Seruni & Central CPI Area Riau | Construction | 3 Aug 06 to 6 Nov 06 | CHEVRON |
20 | Pipe Replacement didaerah Rantau Bais & Benar Field | Piping, Civil Work | Rantau Bais CPI Area Riau | Construction | 3 Aug 06 to 12 Oct 06 | CHEVRON |
21 | Agreement EPC of Balance of Plant (BOP) at Sengkang - South Sulawesi | Engineering, Procurement and Construction (lnstrument. Electrical & Civil) | PT.Medco Power Indonesia | Enggineering, Procurment, Construction | 18 Jan 06 to 30 Nov 07 | PT. MCI |
22 | Rekayasa, Pengadaan dan Pemasangan Sistim Transmisi Gibit Mltiservice | IT System, Commissioning Work | Enggineering, Procurment, Construction | 01 April 2006 | ||
23 | Pager GS Gas Syatem Project (R-Stage) | Earthwork, Civil, Mechanical, Piping, Electrical, Instrument, Pre Commissioning Work | Pager GS CPI Area Riau | Enggineering, Procurment, Construction | 29 Apr 06 to 6 Oct 06 | PT. CPI |
23 | AGREEMENT FOR ROAD CONSTUCTION | ROAD CONSTUCTION | ChevronTexaco Derajat Geothermal III, West Java | Enginnering, Procurment & Construction | 180 DAYS | |
YEAR | : 2005 | |||||
1 | Install Threadolet, Gate Valve, Plug & Nipple 3/4" #800 at Pager | Piping Work | Libo Bais CPI Area Riau | Construction | 26 Dec 05 to 29 Dec 05 | PT. CPI |
2 | New OKI to Libo 8" Gas Line | Piping, Civil Work | Libo Bais CPI Area Riau | Construction | 20 Dec 05 to 1 Feb 06 | PT. CPI |
3 | Lateral Flow Line ReplacementAreas 2 & 3 Minas | Piping, Civil Work | Minas (SLS) CPI Area Riau | Construction | 27 January 2006 | |
4 | Lateral Flow Line Replacement Area Kotabatak | Piping, Civil Work | Kota batak CPI Area Riau | Construction | 25 January 2006 | |
5 | Balam SO#138 & Balam SO#154 | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Balam CPI Riau | Procurment & Construction | 15 Dec 05 to 23 Jan 06 | PT. CPI |
6 | Penyediaan Panel Listrik platform Melahin | |||||
7 | Tandun #11, Pinggir#3, Intan#7 Reactivation | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Tandun, Pinggir, Intan CPI Riau | Procurment & Construction | 8 Dec ‘05 to 20 Jan 06 | PT. CPI |
8 | Tempory Meter Facility | NDT Work | HOOU Duri CPI Riau | Procurment & Construction | 05 Dec ‘05 to 17 Jan ’05 | PT. CPI |
9 | Lateral Flow Line Replacement Area 6 Minas | Piping, Civil Work | Construction | 11 January 2006 | ||
10 | Production Facilities Installation for Puncak 2 Weels (0-0-88 & S1-0-17) | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Puncak CPI Riau | Procurment & Construction | 1 Dec 05 to 5 Jan 06 | PT. CPI |
11 | Flexible Program Management Services | Contract Service for Rig Assist | All CPI Area Riau | Drilling | 22 Dec 05 to 31 Dec 07 | PT. CPI |
12 | Construct Petani N1-W1-78 (111) | Civil, Piping, Electrical, Instrument, Work | Petani CPI Riau | Procurment & Construction | 1 Dec 05 to 21 Dec 05 | PT. CPI |
13 | Construct Pematang BOW S4-0-56A (26) | Civil, Piping, Electrical, Instrument, Work | Pematang Bow CPI Riau | Procurment & Construction | 30 Nov 05 to 16 Dec 05 | PT. CPI |
14 | Sandblasting & Painting for Accessories of Bangko GS New Shipping Tank | Sandblasting & Painting Work | Bangko CPI Riau | Procurment & Construction | 27 Nov 05 to 16 Dec 05 | PT. CPI |
15 | Reco#01 PO (Nearby Kelok) | Civil, Piping, Electrical, Instrument, Work | Reco CPI Riau | Procurment & Construction | 25 Nov 05 to 24 Dec 05 | PT. CPI |
16 | Replacement Pipe 30" Main Production Line | Piping, Civil Work | Minas (SLS) CPI Area Riau | Construction | 10 November 2005 | |
17 | PIG Launcher & Receiver Modification at Duri, Dumai & Minas | Mechanical, Piping, Civil Work | Duri, Dumai, Minas - CPI Riau | Contruction | 23 Sep 05 to 13 Feb 06 | PT. CPI |
18 | Construction of Weel Test Facility Petani North | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Petani CPI Riau | Procurment & Construction | 15 Aug 05 to 23 Mar 06 | PT. CPI |
19 | Base Coaerse A | Material | Minas (SLS) CPI Area Riau | Construction | 1 Aug 2005 | |
20 | Bangko 36" Pipe Replacement | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Bangko CPI Riau | Procurment & Construction | 25 Nov 05 to 11 Apr 06 | PT. CPI |
21 | Topaz - Petapahan Main Production Line Replacement | Mechanical, Piping, Civil Work | Topaz CPI Area Riau | Construction | 27 July 2005 | |
22 | Installation of Electrical Facility for New Kota Batak LACT Meter at Kota Batak GS | Electrical, Commissioning Work | Kota Batak CPI Area Riau | Construction | 26 July 2005 | |
23 | Bangko GS New Shipping Tank for Electrical and Instrument | Electrical, Instrument & Commissioning Work | Bangko CPI Riau | Procurment & Construction | 25 Jul 05 to 11 Apr 06 | PT. CPI |
24 | LACT Meter Hot Tap Connection Work, Surface Production for Bekasap 0-E1-54 & 0-E1-54A & Surface Produaction Facilities and Lifting Equipment for Bangko Horizontal N1-W3-53 (237) | Machanical & Piping Work | Libo, Duri, Dumai CPI Riau | Contruction | 14 July 2005 to 12 January 2006 | PT. CPI |
25 | Bangko-Dumai 30" Pig Receiver Relocation | Mechanical, Piping, Civil Work | Dumai CPI Riau | Engineering, Procurement, Construction | 4 July 2005 to 16 Januray 2006 | PT. CPI |
26 | Penggantian Screw Atap yang sudh Rusak | Civil Work | Pangakalan Kerinci Riau | Procurment & Construction | 25 July 2005 to 20 August 2005 | N/A |
27 | Bangko Production Line Replacement 2005 | Piping, Civil Work | Bangko CPI Riau | Procurment & Construction | 22 July 2005 to 06 March 2006 | PT. CPI |
28 | Pengantian Tap yang Bocor | Civil Work | Pangakalan Kerinci Riau | Procurment & Construction | 21 July 2005 to 03 September 2005 | N/A |
29 | Bangko EOR Phase-1 & 2 Jumper | Piping Work | Bangko CPI Riau | Procurment & Construction | 12 July 2005 to 27 October 2005 | PT. CPI |
30 | Development Well (9 Weels) | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Bangko CPI Area Riau | Construction | 08 July 2005 | |
31 | Balam, Rantau Bais, Ubi Individual Pipe Replacement 2005 | Mechanical, Piping, Civil Work | SLN CPI Area Riau | Construction | 30 Mei 05 to 11 Jan 06 | PT. CPI |
32 | Development Well (9 Weels) Construction at Balam Telisa | Mechanical, Piping, Civil Work | SLN CPI Area Riau | Construction | 27 Mei 2005 | |
33 | Nusa-5 New Pipeline | Mechanical, Piping, Civil Work | SLS CPI Area | Construction | 13 Mei 2005 | |
34 | Bangko GS Compliance | Mechanical, Piping, Civil Work | Bangko CPI Area Riau | Construction | 13 Mei 2005 | |
35 | Waterleg Storage Bangko | Mechanical, Piping, Civil Work | Construction | 13 Mei 2005 | ||
36 | Modification Of Deareator | Mechanical, Piping, Civil Work | Kerinci RAPP | Construction | 20 April 2005 | |
37 | Installation of Stage 1 Kulim Facility Upgrade | Mechanical, Piping, Civil Work | HO CPI Area Riau | Construction | 01 April 2005 | |
38 | Construction of the Pig Launcher at Minas NBS | Mechanical, Piping, Civil Work | Minas CPI Riau | Procurment & Construction | 31 Mar 05 to 25 Apr 05 | PT. CPI |
39 | Nusa-6 New Pipe Line | Piping, Civil Work | SLS CPI Area | Construction | 05 Mar 2005 | |
40 | Nusa - 5 New Pipe Line | Piping, Civil Work | SLS CPI Area | Construction | 28 Feb 2005 | |
41 | Mechanical Construction of Pig Launcher and Receiver Facilities | Mechanical, Piping, Civil Work | Duri, Dumai, Minas (SLS) CPI Area Riau | Construction | 04 Feb 2005 | |
42 | Water Leg Storage Tank Bangko GS Modification | Mechanical, Piping, Civil Work | Bangko CPI Area Riau | Construction | 03 Feb 2005 | |
43 | Jorang fery landing | Civil Work | Bangko CPI Area Riau | Construction | 08 July 2005 | |
44 | SS Pipe A10 DSF | Mechanical, Piping, Civil Work | HO CPI Area Riau | Construction | 2005 | |
45 | Mechanical Works-Bangko GS Compliance | Mechanical, Piping, Civil Work | Bangko CPI Area Riau | Construction | 03 Feb 2005 | |
46 | Civil Construction of Pig Launcer and Receiver Facility | Mechanical, Piping, Civil Work | Minas CPI Riau | Procurment & Construction | 27 Jan 05 to 30 Mar 05 | PT. CPI |
47 | 24" Pipe Replacement Petani # 12 | Piping, Civil Work | Petani CPI Riau | Procurment & Construction | 25 Jan 05 to 30 Sep 05 | PT. CPI |
48 | Liokasam Pipe Replacement | Piping, Civil Work | Libo CPI Area Riau | Construction | 17 December 2004 | |
49 | Installation On-Plot Pipeline and other Associated Equipment for HEX Project at CGS-1 | Piping, Civil Work | HO CPI Area Riau | Construction | 6 December 2004 | |
50 | Installation of Regulator & Spool at Balam Test Station | Piping Work | Balam CPI Area Riau | Construction | 3 Dec 2004 | |
51 | Mechanical, Tanki, Piping & Elektrical Work | Civil, Piping, Electrical, Instrument Work | Balam CPI Area Riau | Construction | ||
52 | Fabricate & Install Test Tank at Bangko Test Station D | Civil, Piping, Electrical, Instrument Work | Bangko CPI Area Riau | Construction | 3 November 2004 | |
53 | Pekerjaan Pemancangan & Pemasangan Tiang Listrik | Power Line Work 115KV, 13.8KV, Tower & Power Pole | Bangko CPI Area Riau | Construction | 27 October 2004 | |
54 | Bangko Pipe Replacement | Piping, Civil Work | Bangko CPI Area Riau | Construction | 21 October 2004 | |
55 | Replacement Water Injection Line Section 602A, 602B, 602B, 604, 505 at Minas | Piping, Civil Work | Minas CPI Riau | Construction | 12 Jan 05 to 18 Apr 05 | PT. CPI |
56 | Beveling Pipe 16" & 18" At Minas | Piping, Civil Work | Minas CPI Riau | Construction | 12 Jan 05 to 18 Apr 05 | PT. CPI |
57 | Piping Replacement Pipe Area 1 and Area 2 | Piping, Civil Work | Minas CPI Area Riau | Construction | 08 Okt 2004 | |
58 | Installation Pipe Line On Plot Of HEX CGS 1 | Piping, Civil Work | HO CPI Area Riau | Construction | 04 Okt 2004 | |
59 | Balam Pipe Project | Piping, Civil Work | Balam CPI Area Riau | Construction | 04 Okt 2004 | |
60 | Tank Bangko | Piping, Civil Work | Bangko CPI Area Riau | Construction | 04 Okt 2004 | |
61 | Pipe Replacement Minas 1 & 2 | Piping, Civil Work | Minas CPI Area Riau | Construction | 04 Okt 2004 | |
62 | Liokasam Petapahan | Piping, Civil Work | Petapahan CPI Area Riau | Construction | 04 Okt 2004 | |
63 | MFU Flocculent Project | Piping, Civil Work | HO CPI Area Riau | Construction | 04 Okt 2004 | |
64 | Pipe Line Replacement At Balam and Ubi | Piping, Civil Work | HO CPI Area Riau | Construction | 01 Okt 2005 | |
65 | Distribution Line 13.8 kv From Candi Field to Tilan Field | Power Line Work 13.8KV, Power Pole | Candi Tilan CPI Area Riau | Construction | 07 Sept 2004 | |
66 | Petani AWT Central Off Plot Piping | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Petani CPI Area Riau | Construction | 23 Agust 2004 | |
67 | Civil, Piping & Electrical | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Pertamina Dumai Riau | Construction | ||
68 | BRC Galvanized, B3 dll | Civil Work | Pangakalan Kerinci Riau | Procurment & Construction | 25 Apr 05 to 11 Jul 05 | N/A |
69 | Used & Waste Oil Storage | Civil Work | Pangakalan Kerinci Riau | Procurment & Construction | 21 Jul 05 to 03 Sep 05 | N/A |
70 | Peningkatan Exterior Gedung Utama Tahao II RS Jantung & Pembuluh Darah Harapan Kita | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | RS. Jantung & Pembuluh Darah "Harapan Kita" | Construction | 09 Sept 2005 | |
71 | Kontrak Pelaksanaan Pekerjaan Rehabilitasi Gedung Aula KPP Jakarta Gambir Tiga | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | KPP Jakarta Gambir Tiga | Construction | 26 Juli 2005 | |
72 | Contract Agreement for Hangar Construction for PT. Aero Nusanatara Indonesia at Budiarto Airport Curug, Banten | Civil, Piping, Electrical, Instrument, Pre Commissioning Work | Curug, Banten | Construction | 17 Feb 2005 | |
YEAR | : 2004 | |||||
1 | Sliding Gate | Civil, Mechanical, Electrical, Commisioning Work | Minas CPI Riau | Engineering, Procurement, Construction | 22 Jul 04 to 21 Oct 04 | PT. CPI |
2 | Repair Pressure Vessal Services | Mechanical, Piping Work | HO CPI Area Riau | Procurment & Construction | 15 Jun 2004 | |
3 | Switchgear MCC | Procurment Material Installation | Procurment & Construction | |||
4 | Piping and Power Distribution Systems Contruction - Balam Telisa Waterflood Project | Civil, Mechanical, Electrical, Commisioning Work | Balam CPI Area Riau | Construction | 07 Jan 2004 | |
5 | Gathering Station Abandoment and Site Restoration at Ayu GS and Well in Ayu Field | Civil Work | Ayu GS CPI Area Riau | Construction | 16 Feb 2004 | |
6 | CVC Cooler A7 & A8 DSF | Civil, Piping, Mechanical, Electrical, Instrument, Pre Commissioning Work | HO CPI Area Riau | Construction | 06 Jan 2004 | |
7 | Remaining Civil Fondation Works | Civil Work | HO CPI Area Riau | Construction | 06 Jan 2004 | |
8 | Condensate Line | Piping Work | HO CPI Area Riau | Construction | ||
9 | Teuch-Up ACHE | Civil Work | HO CPI Area Riau | Construction | 02 Jan 2004 | |
10 | PEMBANGUNAN JALAN DAN JEMBATAN | PEMBUKAAN BADAN JALAN DAN PERKERASAN KM. 30 | KEL. SEI MERDEKA, KALIMANTAN TIMUR | Enginnering, Procurment & Construction | 465 DAYS |